Commercial Asbestos Roof Removal in Maryborough
Total Asbestos removed 730 square metres of asbestos roofing from an unoccupied government building in Maryborough over two days. Following hygienist clearance, the site was handed over to Roof Pro by the agreed deadline for re-roofing.
| Location | Maryborough, Queensland (about 250 km north of Brisbane) |
|---|---|
| Client | Roof Pro (roofing contractor) |
| Building | Government building, unoccupied during removal |
| Scope | 730 m² of asbestos roof removal ahead of re-roofing |
| Removal duration | Two days |
| Crew | One supervisor and seven removalists |
| Access | Scissor lift |
| Regional logistics | Crew travelled from Acacia Ridge and stayed overnight in Maryborough |
| Work area controls | Exclusion zone with asbestos bunting and signage |
| Dust suppression | Water used to keep the roofing wet during removal |
| Air monitoring | Carried out; results reported within limits |
| Handover | Hygienist clearance, then handover to Roof Pro for re-roofing |
The Brief: Asbestos Removal Ahead of Re-roofing
Roof Pro engaged Total Asbestos to remove the asbestos roof from a government building in Maryborough. Roof Pro would then install the replacement roof, so the removal and the clearance were critical steps in the overall roofing program. The building was unoccupied while the removal took place. The scope covered 730 square metres of asbestos roofing, with a defined handover deadline so Roof Pro could proceed.


The Challenge: A Regional Job With a Firm Deadline
Alongside the roofing contractor’s deadline, the main logistical challenge was the distance from Total Asbestos’s Acacia Ridge base. Travel and on-site resources had to be coordinated so the whole removal fitted inside a two-day window.
Resourcing the Two-Day Removal
Total Asbestos deployed an eight-person crew, one supervisor and seven removalists, who stayed overnight in Maryborough between the two days rather than returning to Brisbane. A scissor lift provided access to the roof, and the work was organised around the agreed removal period and the hygienist’s attendance so the site could be handed over for the next stage.


Managing the Asbestos Work Area
An exclusion zone was set up with asbestos bunting and warning signage to restrict access, and the building stayed unoccupied throughout. Water kept the roofing wet to suppress dust as the sheets were removed. Air monitoring ran during the project; Total Asbestos reports the results were within limits and no further action was required.


Clearance Before Handover
The 730-square-metre roof removal was completed over two days. A hygienist attended to carry out clearance before Total Asbestos handed the site back to Roof Pro, who then carried out the re-roofing. Total Asbestos’s scope was the asbestos removal and handover; the replacement roof was Roof Pro’s.


Meeting the Roofing Contractor’s Program
Total Asbestos met the agreed handover deadline. The eight-person crew, the overnight stay in Maryborough, scissor lift access and coordinated clearance delivered the removal stage inside the required timeframe.
Coordinating an asbestos roof replacement?
Our asbestos roof removal service works alongside roofing contractors on homes, sheds, commercial and government buildings across South East Queensland and regionally. Contact Total Asbestos to discuss removal scope, access, regional mobilisation and handover requirements for your roofing program.
Talk to Us About Your Roofing Program
Roofing contractors: send us the roof area, location and your re-roof date and we will quote the removal, clearance and handover around it.
(07) 3151 0312
49 Loam Street, Acacia Ridge QLD 4110
Monday to Saturday, 6:30am to 5pm